Thursday, April 23, 2020

Plaster, Cardboard, Painting and a Couple of Cabooses

Since the ground around the real Farmington is pretty flat, there is not much to put on a backdrop so I contented myself with low rolling hills and distant mountains. The Sculptamold will eventually be painted and covered with dirt.
After some family activities which occupied about a week of time which could have been spent on the railroad, I finally got back to it this week.It seems that all of the necessary buildings for Farmington have been constructed and so it was necessary to get on with the scenery. Cork sheets helped to build up the structures so they would be even with the roadbed. Sculptamold was then used to even out some of sharp edges created by chunks of plywood and cork. When covered with dirt and vegetation, the landscape will look fairly realistic. Cardboard strips were laid down to mark where roads will eventually reside. When the Sculptamold is dry, it will be painted the same bland color the rest of the area is painted.
     This morning, I went down to the basement to see what I could do about a backdrop. I have never made claims to being an artist and I only aspire to my backdrops providing the suggestion that there is something beyond the railroad. They don't have to be perfect. After all, I hope the visitors are looking at the trains and structures more than the backdrop. In any case, I managed to get the job done and am reasonably satisfied with the work.
   
Farmington is at the end of an aisle behind the photographer, or will be. Now it's strung out all along the railroad. Once the scenery is done here, there will be a long stretch of track with no unscenicked sections.
After deciding where each structure was going to be placed, I removed them and stacked them on other parts of the railroad. I had no idea that they would take up as much space as they do.
     A few weeks ago, I had finished a grain warehouse but wanted rolled roofing to complete the project. My normal supplier was suffering, as everyone else is, with being confined to his house. It took a few weeks to get the material but it was finished this week and that structure is now ready for placement.
   
Two S&I cabooses awaiting a train for Ione. Now all I have to do is get a couple of working locomotives.
While waiting for roofing and things to dry, I took a quick break and built up a couple of narrow gauge caboose kits for the Stockton & Ione. These were Grandt Line C&S kits I had had for a while. One of them was built per the kit with a cupola. The other I decided to represent as an old car which had yet to be fitted for a cupola. Both were readily assembled even though some of the kit parts are very tiny.
     At least the world situation has allowed me to get some work done and clutter up the railroad while I do it.

No comments:

Post a Comment