Duck Creek just outside Farmington (in the distance) is now bridged. The plaster cloth is applied right over the existing scenery which will then be blended into the new sction. |
Both trestles were built using basswood scale lumber assembled in a jig I made. Once the trestle was ready, I carefully sawed away the plywood subroadbed while leaving the tracking hanging over the gap. The ties were removed and then Barge cement was applied to the bottom of the rails and was allowed to dry. To install the structure, I placed the trestle beneath the rails and then shimmed up the trestle bents to level the structure. A small iron was placed on the rails which melted the cement and glued them to the bridge. A track gauge was used to make sure that the rails were in the proper alignment.
Plaster cloth was then applied around the trestle give the scenery a base. I still need to use some Sculptamold to smooth out the approaches and fill any gaps. Then, I can paint the plaster, apply dirt and maybe even a small trickle of water.