![]() |
| Milton in 1871 in a view that will not be seen on the model. The P&D warehouse is to the left with the depot building at the right. The P&D general store is at the center. |
Wednesday, August 17, 2016
Down by the Milton Tracks
Monday, August 1, 2016
The Beginnings of Milton
![]() |
| The Milton depot contains a freight, ticket office and the P&D store as well as an advertisement for a local health center. The platform will be continued in both directions from the building. |
There were several freight forwarders who would undertake to move your goods to their final destination and several stage lines as well. The best way to reach Yosemite Valley was through Milton. The Yosemite traffic ended in 1887 when the Southern Pacific built the Raymond branch. It was a closer trip and you could stay in your Pullman all the way to Raymond. When the Sierra Railroad was completed in 1897, it reached all the way up to Sonora, the heart of the mining district so almost all the freight now went via the Sierra and Milton became a very sleepy town.
In 1895, there was still an active town with all of the stores occupied. The Sanborn map company visited there in 1890, 1895, 1908 and 1912 so there is a lot of documentation regarding what was in town. I also have enough photos and, more interestingly, enough layout space to model virtually the entire business area of the town to scale.
My first structure, fittingly, is the S&C's depot, built in 1871 along with the several warehouses strung out along the siding. The depot building had a large freight house and shared the structure with a small store run by Peterson & Dake. They also owned a grain warehouse located on the siding (my next structure). P&D were also the Western Union Telegraph and Wells, Fargo & Co's. agent.
My building is all of styrene except for the Minuteman Scale Models shingles and was modeled full size. Few photos of the building are available so some features had to be based on common practice and available plot plans. Next project will be to continue the platforms to define the siding area before continuing on with the actual structures.
Saturday, July 23, 2016
An Entire Op Session Somewhat Condensed
As I have mentioned before in this blog, the S&C holds monthly prototypical operating sessions. The railroad normally takes a crew of 10 people to operate. The jobs consist of a dispatcher, operator to copy train orders and operate the interlocking machine, and a yardmaster for Stockton Wharf. Sessions last about three hours long, the morning session covering 5:30 a.m. to 2:00 p.m while the afternoon session runs from 2:01 p.m. until the last train is in (usually about 10:30 p.m. or so). We are not running a night session but that may change when management decides to paint some of the locomotives it has stored in boxes.
Last Saturday, July 16, we had July's session but with only nine folks in attendance. It turned out to be real good especially since I got to try out a new camera. It is the Replay Prime X which is a neat little video camera designed for use by people with more active hobbies such as skydiving, Motocross, skiing, etc. It has a variety of clamps so it can be attached to a tripod, bicycle handlebars, stuck on a wall and so on. For some reason, it didn't come with an attachment to fit on a model railroad car. For last week, it didn't matter since it was just a test so I clamped the camera to the fascia just above Peters and recorded the entire 3-hour session in time lapse mode. Here's the results in only a minute and a half.
![]() |
| Here's the Replay camera. The computer mouse is in the photo just for a size comparison. The nifty little clamp above the camera dates from the 1940s and is very good for holding small cameras. |
The experiment also allowed me to get familiar with a new video editing program. The video isn't all that great (it was only a test) but it proves that the camera can be used for other railroad purposes. My next job will be to attach it to a car so I can photograph while the train is moving.
Thursday, July 21, 2016
Switch Engine for the S&I
![]() |
| The Ione can easily pull two cars plus a little more. |
Overall, the performance is very good. The engine can pull 2 cars with ease and a third one on level track, just about what the prototype would be expected to do. It does run very well with the mobile decoder and some momentum built in.
Friday, July 1, 2016
The Storey is Finally Complete
![]() |
| The Storey sits on the Copperopolis turntable ready for her next assignment. The engine was the Virginia and Truckee Railroad's No. 3. |
A Tsunami TSU-750 along with a sugar cube speaker were mounted in the tender.
![]() |
| With the Storey and Ormsby sitting side by side, it is easy to see the size difference between the two locomotives. The Storey was more the size of the later Baldwin engines bought by the V&T. |
Friday, June 17, 2016
Ormsby Now in Service
![]() |
| A torque arm was added and screwed to the 28:1 gearbox. It attaches to the motor with silicon caulking. |
![]() |
| To get enough clearance with the small driving wheels, the bottom cover of the gearbox had to be removed. Electrical wipers are installed on the left-side drivers to get more pickup. |
Ormsby only has 40" drivers and is about 15% smaller than the other engines. That's the way the prototype was and why these engines sadly did not last into the 20th century.
![]() |
| The Ormsby alongside the Calaveras. It is easy to see that difference in size between the locomotives. |
One of the unexpected pleasures of this little engine is its pulling power. I tried it out with a few cars and kept adding more until I got to 15 and it was still pulling well on level ground. I can't complain. Part of this happy result was undoubtedly due to the tungsten weights I used instead of lead. Woodland Scenics makes a line of these weights designed for Pinewood Derby cars. They were just the right size (3/8" diameter) to fit in the boiler and under the cab roof.
Thursday, May 26, 2016
Kit-Built Flat Cars
The pieces used to build these cars were laser cut for me by a friend who, obviously, has a laser cutting machine. I designed the car after an 1870s era Central Pacific flat car and tried to get as much work done in the laser cut as I could. When cutting out the car, I had the holes for Grandt Line stake puts burned in the car sills as well as more holes for nut-bolt-washer castings for truss rods, etc. I did have to buy the stake pockets, NBW castings and some Tichy brake wheels and mounts for flats.
One of the things I did was make two flat cars each bearing the same number. The loads I wanted to model would those that were tied and lashed down with chain, rope and chocks and would not be easy to remove. When operating the railroad, the crews would deliver the car with its load but I wanted to be able for them to remove the empty car. The easiest way to do this would be to build two identical cars, one with the load and the other with just the remnants of the dunnage. So far, I haven't put any loads on them except for the portable boiler/engine and that isn't tied down yet.
Now, back to finishing up my two locomotives.
Subscribe to:
Posts (Atom)
















