Pages

Tuesday, April 9, 2019

A Pair of Warehouses

Waverly occupies a lonely place in the San Joaquin Valley with nothing there except for the P&D warehouse.
In taking a break from engine terminal project, I was looking for something which would improve the railroad but not take a lot of time. I found it in two grain warehouses, one at Waverly and the other at Charleston. The Waverly warehouse "vacant lot" had bothered me a bit since it's about the only unscenicked portion in that particular aisle. I decided to do Charleston at the same time since it would be about the same size and construction.
   
The doors on the left side of the building were used to unload wagons. Similar
doors trackside were used for car loading.
 Peterson and Dake owned the grain warehouse in Milton and also operated the Waverly warehouse. I had a bit of information from insurance maps and railroad records but no photos so I freelanced the building from what little I knew. I used board and batten siding (Evergreen) with a shingled roof. Loading doors adorned both sides of the building for the loading/unloading of wagons and freight cars. For the roof, I chose to use up some of my pile of Campbell shingles just to have a slightly different look from my usual Minuteman Models variety. The Campbell shingles are gummed but I knew they would not stick to styrene so I opted for an illustration board roof I bought from the local Hobby Lobby. I also opted to save my tongue in the moistening process and rigged up a damp sponge. The shingles went on nicely and, while they do not have the newly-applied look of the MM shingles, look like they've been on the building for a while. The structure was then painted to match the Milton structure and similar decals were printed and applied.
     
Grube's Warehouse is the only industry at Charleston and is butted up against the backdrop.
Over at Charleston, the only information I had was the dimensions of the building. The available space required a slight shrinkage of the building but it is in keeping with the siding length. Evergreen grooved siding was used with Grandt Line doors and the Campbell shingles-on-illustration-board roof. The lettering was freelanced.
   
 Both of the areas still require scenicking to finish the sites and that will be completed in the next week or so. Waverly also has to have a small oil loading facility to service the new Waverly tank car a friend of mine donated to the railroad. 

No comments:

Post a Comment