Although the steps seem to be floating in air, when scenicking is done, they will be flush with the top of the ties. An earth berm will run from the train order signal past the privy .
The Farmington Depot is now complete except for scenicking. It was an interesting project using customary model building techniques combined with laser cutting and 3D printing.
The 3D printed casings fit perfectly around the Tichy
window castings.
The depot has some unusual casing details around the upper part of the window. I drew up some 3D drawings of it sized to fit the Tichy windows and doors I was using and sent them to Shapeways to have the casings printed.
     In the prototype photo shown in my last blog (http://sandcrr.blogspot.com/2018/05/laser-cutting-and-depots.html), you can just barely see the end of a ladder peeking out from behind the depot. This was normally used to access the roof and it seems that most of the Southern Pacific depots had one. I relocated mine to the end of the building so someone might actually see it. The small "bridge" on the platform's end was used to span the gap between the platform and a car to aid in loading or unloading of it.
     Adjacent to the depot is something one sees at almost all of the depot photos, the privy. This one is a standard SP design and is made from two of the Tichy outhouse kits. The lattice work around the privy is also from Tichy.
The privy at Farmington and the model privy. It is a close copy. I realize that the model roof has a steeper pitch and the lattice work is square rather than on an angle. These were modeling considerations I took into account to get the "feel" of the structure rather than make an exact copy. In other words, I was a trifle lazy.