Pages

Monday, August 1, 2016

The Beginnings of Milton

The Milton depot contains a freight, ticket office and the P&D store as well as an advertisement for a local health center. The platform will be continued in both directions from the building.
Milton was the easternmost terminal of the Stockton & Copperopolis. Up until 1887, it was one of the busiest towns on the railroad both with goods shipped and received. Everything going to the Mother Lode mining towns north of the Stanislaus River went through Milton. Almost nobody went to Milton. It was simply a transfer point.
    There were several freight forwarders who would undertake to move your goods to their final destination and several stage lines as well. The best way to reach Yosemite Valley was through Milton. The Yosemite traffic ended in 1887 when the Southern Pacific built the Raymond branch. It was a closer trip and you could stay in your Pullman all the way to Raymond. When the Sierra Railroad was completed in 1897, it reached all the way up to Sonora, the heart of the mining district so almost all the freight now went via the Sierra and Milton became a very sleepy town.
    In 1895, there was still an active town with all of the stores occupied. The Sanborn map company visited there in 1890, 1895, 1908 and 1912 so there is a lot of documentation regarding what was in town. I also have enough photos and, more interestingly, enough layout space to model virtually the entire business area of the town to scale.
     My first structure, fittingly, is the S&C's depot, built in 1871 along with the several warehouses strung out along the siding. The depot building had a large freight house and shared the structure with a small store run by Peterson & Dake. They also owned a grain warehouse located on the siding (my next structure). P&D were also the Western Union Telegraph and Wells, Fargo & Co's. agent.
    My building is all of styrene except for the Minuteman Scale Models shingles and was modeled full size. Few photos of the building are available so some features had to be based on common practice and available plot plans. Next project will be to continue the platforms to define the siding area before continuing on with the actual structures.

No comments:

Post a Comment